As for mold pre-shipment checking, except from the standard relates to details of molding machine, the most important thing is to check the fitting of movable components, such as the ejector pins, slides, angled lifters, floating core, etc.

Disassemble the mold, use hands to pull out and move back the slides, angled lifters, and ejection pins to feel the fitting, if they are moved smoothly.